Wednesday, 29 May 2013

Preparation for Phase 2


Phase two will see the removal of the boat from the cellar in 2014. We have to excavate 100 tonnes of infill from the yard before this can happen. Andrew Johnson, MNH Field Archaeologist is preparing a brief for an archaeological dig in the yard. It’s an essential step to take before we send in the diggers, and it will help us decide how best to proceed.

Meanwhile, I took advantage of the presence of the crane last week to remove this anchor from the yard. We’re not certain when it was put there and which ship it belonged to. It’s now sitting safely in the adjacent stable yard.

Mystery anchor?

Delivery of the new cradle


Last Tuesday the new cradle was delivered to the Nautical Museum. Even though it was delivered in pieces it was still necessary to hoist it over the roof of the museum by crane because the museum itself is a rather small and eccentric eighteenth-century timber building situated in a narrow lane. We had to apply for a road closure notice as the crane completely blocked it! The local residents were very patient with us which helped enormously.

Chris from Mann Crane Hire instructs the troops

Galla's Foundry deliver the new cradle
Crane and delivery lorry parked outside the Nautical Museum






Everything went very smoothly....
... and here's the end result. The red sections are the lifting superstructure.

Monday, 13 May 2013

Week's progress

No pun intended...
Geoff has fitted the stainless steel 'yolks' to the keel of Peggy (you'll recall the keel is a replacement dating from 1950). These have a hole through them to take bars that will be used to lift the boat.They are permanent alterations to the keel, and accordingly they are very beautifully made and precisely fitted. They are also slightly rebated so that we will be able to hide them with a suitable veneer once we have used them.
Most of last week was spent phoning round all the contractors that are lined up to help with the lift of the boat and the installation of the cradle, namely the fabricators, jacking crew and crane operator (the new cradle will need to be hoisted into the museum yard over the roof). I have had to apply for closure of Bridge Street to allow the crane to operate. It looks like with are all set for the installation of the new cradle during the week beginning 17th June.

Monday, 29 April 2013

18th century hovercraft?

It would be hard to detail here all of the many, many ideas we have had, some good, some bad, in answer to the technical challenges of lifting the boat and removing it from the cellar. The team at MNH includes Steve Blackford, Head of Properties and his colleagues, and, very importantly, the Technicians, led by Geoff Mitchell. So much thought has gone into our plans that we often forget how we got here. One of our contractors asked this week "Why can't you just take the boat apart and re-assemble it somewhere else?"

How not to take a boat apart # 327
http://cureentnews.blogspot.com/2010_07_08_archive.html


It's a perfectly reasonable question, after all. The answer is that we are trying as hard as we can to preserve what we'd call Peggy's 'archaeological integrity' - that is, all of the tiny relationships between every tiny element she's made of. We know she's a very significant boat but we don't know everything about her, so we are trying to keep as much of the evidence as possible. However carefully we tried, taking her apart would damage her a lot, and that would defeat the point of moving her.

Lately Geoff and I have been thinking hard about the way that Peggy, in her steel support cradle, will slide out of the boat cellar. We are shortly going to lay rails on the cellar floor that'll eventually lead out of the door and into the yard. We have to try to get the rails precisely aligned with each other and on the correct slope. There'll be three rails including one in the centre under the keel. Geoff has designed Teflon pads that the cradle will sit on to help it slide down the rails. Now, obviously we don't want that to happen too soon (!) because the boat will be sitting still for a year or so while we prepare the site for her exit. The pads are not so slippery, nor the slope so steep, that the boat won't stay put. How then to get it moving when the time comes without causing it to judder and shake?
Geoff has invented an ingenious solution to this problem. Each Teflon pad will be fitted with a compressed air inlet. The underside will have grooves in it that will let the compressed air escape, very much like a hovercraft but without the rubber skirt. We calculate this will provide just enough lift to get the boat moving down the rails. Turning off the air supply will act as a brake. Rest assured we will film the device in action so you can see it.

Monday, 22 April 2013

Installation date fixed

The news this week is that I have now fixed a date in the middle of June for the lifting of the boat and the installation of the new support cradle. On the Isle of Man it's usually a good idea to avoid programming complicated site work during the TT Festival in May/ June, so as to avoid getting in the way of the many visitors who visit the Island at that time to enjoy the fun and thrills!
Hydra-Capsule Ltd, of Bishops' Frome, Worcestershire will be lifting the boat for us; they are bridge lifting specialists but have lifted boats before, too. The cradle itself will be delivered in bits, by crane, into the the yard outsides the cellar. It'd be a lot easier if the yard weren't completely walled-in... 
 
Ashley Pettit Architects, Douglas IOM
Nautical Museum Basement level Ground Plan by APA Architects


Then it's simply a matter of inserting the 8 metre central keel support (by hand) and assembling the arms and ribs. The foam inserts that are designed to fit snugly between the steel ribs and the hull are now on order from Polyformes Ltd of Leighton Buzzard.
Meanwhile, I am getting quotes in for the removal of the bank in the foreground of the photograph (see my previous post dated 4th March 2013).

Monday, 15 April 2013

ICON Positive Futures 2013

No post this week as I have been attending the Institute for Conservation Triennial Conference in Glasgow:
ICON Conference logo
It was a very stimulating two days and a chance to meet a lot of friends, old and new. Story telling and engagement with colleagues, friends and the public was a strong theme - keep watching this space!

Thursday, 4 April 2013

The new cradle takes shape

The fabrication of the new cradle for Peggy has been a complicated job, with a good deal of discussion and refinement along the way. In this photo, Kevin from Galla's Foundry in Douglas checks the profiles for the ribs that will eventually support the boat.


... and in this one you can see the lifting superstructure that will protect and support the boat when eventually we lift her out of the boat cellar by crane.